Aqua Fauna Centre
Project Start Date: April 2002
Project Completion Date: October 2002
Client: Aqua Fauna International Pte Ltd
Description: Modern 7 blocks, single-storey werehouse with ample car park and landscape for a modern fish market. Promoted as a tourist attraction at eastern Singapore by Tourist Board.
Aqua Fauna Centre |

Thong Lee Building
Start Date:April 2003
Completion Date: December 2003
Description: A 3-storey office block with a 12-m high warehouse using a Pre-Engineering Building (PEB) system from Vietnam.
Thong Lee Building |

Uni Engineering Building
Start Date:June 2003
Completion Date: June 2004
Client: Uni Engineering Service & Iron Work
Description: A Design-and-Build 2-storey engineering building with a 3-storey office block. Total build-up area of 8,500m2 for logistic trailer manufacturing. With more than 1 hectare open yard for logistic/construction machinery storage space.
Uni Engineering Building |

Sin Hin Hang Building
Start Date:June 2004
Completion Date: April 2005
Client: Sin Hin Hang Transportation Pte Ltd
Description: A Design-and-Build single storey warehouse building (13m height) incorporating a 3-storey office. Total build-up area of 7000m2 with storage space for logistic warehousing and trailers. Pre-Engineering Building(PEB) used for this project.
Sin Hin Hang Building |

Changi Hub
Start Date: August 2005
Completion Date: October 2006
Client:C & P Distribution Pte Ltd
Description: Erection of a 5-storey mega ramp-up warehouse with ancillary office and administration office at 6th floor. Located at Changi South Lane.
Changi Hub |

Nippon Express Singapore
Start Date: September 2005
Completion Date: September 2006
Client:C & P Distribution Pte Ltd
Description: Erection of a 4-storey mega warehouse with 7-storey ancillary and a single ramp up to 2nd storey warehouse. Located at ALPS Ave. Designed to be Nippon Express Singapore HQ.
Nippon Express Singapore |

CWT HQ
Start Date: November 2005
Completion Date: November 2006
Client:CWT Limited
Description:Construction of a 2 storey mega warehouse building (10.5m & 14m floor-to-floor height) for CWT Distribution Ltd’s new HQ with ramp up to 2ns storey, a chemical storage area, an administration office and operations office at mezzanine floor. Pre-engineering Building (PEB) and post-tensioning technology used for this project
CWT HQ |

CWT Cold Hub
Start Date: December 2005
Completion Date: TOP January 2007
Client: CWT Limited
Description: Construction of a 2-storey and an administration office and operations office at mezzanine floor and a cold room for storage of seafood. Pre-Engineering Building (PEB) and post-tensioning used for this project.
CWT Cold Hub |

Jurong Port
Start Date: 01 October 2006
Completion Date: 31 July 2007
Client: Jurong Port Pte Ltd Status: Design-and-Build project
Description: Extention of J4 & J5 to existing single-storey warehouse and erection of 2 new blocks of singlestorey warehouse with offices. Pre-Engineering Building (PEB) and post tensioning-implement for this project.
Jurong Port |

C&P Logistics Hub 2 (Phase II)
Start Date: March 2006
Completion Date: April 2007
Client: C&P Holdings Pte Ltd Description: Construction of a 5-storey mega ramp-up warehouse building (9m floor-to-floor height) and with an operations office at mezzanine floor. Pre-Engineering Building (PEB) and post-tensioning used for this project.
C&P Logistics Hub 2(phase II) |

RichLand Busines Centre
Start Date: September 2006
Completion Date: December 2007
Client: RLG Development Pte Ltd Description: Construction of a 4-storey ramp-up warehouse (10.4m floor-to-floor height) with a showroom and office at 5th Storey as HQ. Incorporating a new ramp-up concept adopted for a land size of 9,882m 2.
RichLand Busines Centre |

CWT Logistics Hub 2
Start Date: September 2006
Completion Date: August 2007
Client: CWT Limited Description: Construction of a 5-storey mega ramp-up warehouse building (9m floor-to-floor heights) with an operations office at mezzanine floor Pre-Engineering Building (PEB) and post-tensioning used for this project.
CWT Logistics Hub 2 |

Focus One
Start Date: December 2006
Completion Date: January 2008
Client: Ascendas (UBI) Pte Ltd
Description: Construction of a 4-storey multi-user light industrial ramp-up building comprising 40nos terrace factory and 36 nos flatted factory.
Focus One |

Zuelling Pharma Distribution Centre
Start Date: December 2006
Completion Date: January 2008
Client: a-reit
Description: Construction of a 2-storey 12m high (floor-to-floor) air-conditioned warehouse with cold room with ramp up and offices. GMP auditing is adopted for quality assurance.
Zuellig Phama Distribution centre |

Pioneer Walk Logistics Hub
Start Date: May 2007
Completion Date: October 2008
Client: a-reit
Description: Construction of a 6-storey ramp-up multi-users warehouse (9m floor-to-floor height) and offices. GFA is about 91,000m 2.
Pioneer Walk Logistics Hub |

Jian Huang Business Centre
Start Date: 15 January 2008
Completion Date: 31 December 2008
Client: Jian Huang Engineering Pte Ltd
Description: Proposed erection of a 5-storey single-user light industrial development of a 5-storey prising of warehousing space, workshop areas and ancillary offices on lot 3831k(A2410400) MK07 at No.17 Tuas Avenue 18. This building, upon completion, will house all companies of Jian Huang Group.
Jian Huang Business Centre |

Suki Sushi
Start Date: April 2008(tentative)
Construction Duration: 16 months
Client: Messrs Suki Sushi
Description: This is a single-user 8-storey 16,474m2 industrial complex with a basement car park and incorporating food production areas, a training restaurant, office spaces and a roof-terraced landscaped sky garden at the 4th level. The main structure will be of reinforced concrete. Precast concrete panels, metal curtain walls and glass panels form the external facade.
Suki Sushi |

Schenker WareHouse
Start Date: 15 May 2008
Construction Duration: 14 months
Completion Date: 1 July 2009
Client: Tech-Link Storage Engineering Pte Ltd
Type of Contract: Warehouse
Description: Proposed erection of a 2-storey single user light industrial development comprising warehouse at 1st & 2nd storey and ancillary office at mezzanine floors at Pte lot A0439900 at Tuas View Lane.
Schenker WareHouse |

TATA Communications Exchange
Start Date: 23 October 2008
Construction Duration: 15 months & 1 week
Completion Date: 29 January 2010
Client: Maple Tree Industrial Fund Management Pte Ltd
Type of Contract: Design & Build (Build to Suit)
Description: Design & Construct a 6-storey date center with multi-storey car park.
TATA Communications Exchange |
|